Mainpf_787
MainPf_FuelFarm
SidebarPf_FuelFarm

787 Fuel Farm

The electrical work on this project has many components in preparation for The Boeing Company’s 787 Dreamliner. Our team installed a new integrated controls system, cathodic protection, leak detection, and emergency fuel shut off systems for the 4 new million gallon tanks. The new 45-056 building adjacent to the Fuel Farm is the controls center for the Fuel Tanks and Wingtip Fuel Jettison Tanks. Our work for this building included providing and installing the PLC Control Panel Boards, MCC Unit, Power Monitoring Control System and electrical equipment.